Completed Developments

J.C.S Interiors have undertaken a variety of projects in the past, a few of our recent ventures are shown below.

Gloucester Student Accommodation 297 bedroom


Chorley Apartment Scheme


Bradford Metsec Scheme


Salford Tower Blocks Enabling


Burnley Hospital Ward Refurbishment


Maternity Hospital Barrow In Furness


Arkwright House Refurbishment Manchester


600 bed Student Accommodation Swansea


Life Science Accelerator Liverpool


Dowrey Medium Secure School London


Wade Deacon High School
CEP acoustic baffles installed vertically and horizontally to main hall, dance studio, dining hall and library. Multi coloured Soundsorba Wallsorba acoustic wall panels to main hall, dance studio and sports hall.

Unity Commercial
17 story commercial office space averaging over 1000m2 of ceiling per floor.   146mm 'I' studs forming walls and bulkheads over 2 levels, faced with 18mm birch plywood followed by directly bonded patterned glass panels.

St Catherine's Hospital
4 story hospital atrium area constructed from Lafarge / Sineat curved walls and bulkheads. Bespoke GRP (fibreglass) waveform ceiling, curved on plan.

SAS Liverpool
Installation of SAS Vitreous enamel tunnel lining panels and subframe complete with advertising / light box assemblies.

Marne Mess
Tiered ceiling constructed from Armstrong 15mm grid, Axiom downstand profiles and Cellio ceiling tiles.

King David School
3 story high school main hall. Walls and sloping ceiling built using Lafarge - Sineat Megadeco and Pregybel boards to a provide a high degree of acoustic control.

Calderstones MSU
Hunter Douglas - Luxalon wood Linear ceiling.